Army National Guard Leader Development Program

Enhance and support the State's and Territories' capability to develop Army National Guard leader's knowledge, skills, competencies, attributes, and behaviors to produce agile and adaptive leaders at echelon, who are able to operate and succeed in complex and dynamic environments. By Creating and providing leader development resources, opportunities, and content in the experiential and self-development realms of professional development, which deliver broadening experience or increased technical and conceptual competency in order to enable Leader Development across the 54 States and Territories.

Holistic Health & Fitness

H2F is a capabilities-based, task and environment focused, Human Performance Optimization (HPO) program. HQDA EXORD 149-19 directs the Total Army to implement the H2F System. For the Active Component (AC), H2F provides Soldiers direct access to specialized medical and mental health care providers, athletic trainers, and strength coaches at the brigade level. The ARNG model will not mirror the AC model, while still accomplishing the desired end state of improving physical fitness, injury avoidance and recovery, nutritional health, and mental/spiritual resilience.

The ARNG achieves H2F Systems goals of improving Soldier readiness and lethality, optimizing physical/non-physical performance, reducing injury rates, improving rehabilitation after injury, and increasing overall effectiveness through a Directorate enabled and State/Territory led approach which accounts for ARNG unique requirements, opportunities, constraints. The ARNG will accomplish this through a blend of material solutions, subject matter expertise, federal and state resources, and health care professionals.

Workout Video Playlist
Video by Jay Woods
The U.S. Army Corps of Engineers Little Rock District makes spillway releases from Beaver Dam in northwest Arkansas on May 26, 2020.
U.S. Army Corps of Engineers, Little Rock District
May 26, 2020 | 0:33
The U.S. Army Corps of Engineers Little Rock District makes spillway releases from Beaver Dam in northwest Arkansas on May 26, 2020. The total controlled release from the spillway gates and hydropower is approximately 7,500 cubic feet per second. Hydro release = 3,800 c.f.s. Spillway release = 3700 c.f.s. The Corps is advising areas downstream of the dam to begin assessing their respective plans and to begin taking the proper precautions. Landowners with belongings near the river’s edge should also begin making plans for high water. Flood damage reduction lakes work by capturing runoff in their “flood pools” during heavy rain. After rivers downstream begin receding, water is released in a controlled fashion following pre-determined “operating plans.” Without the lakes, all that water would roll downriver at one time. Flood crests would rise higher and spread over more land, thus causing more damage and possibly loss of life. The water stored in the flood pool must be evacuated in preparation for the next storm as quickly as downstream conditions permit without creating additional flooding. The difficulty with repeated rain is engineers are not always able to release all the water captured in the flood pool between rains. This can cause lake levels to rise with each new rainfall. When that occurs, it can sometimes take many months to empty the huge volumes of water from the flood pools and return all the lakes to their “conservation pools.” It is worth noting the lakes are not intended to prevent all flooding. The lakes have limitations that Mother Nature can exceed. Therefore, downstream property owners should be judicious in how they develop land within the flood plains. Floods are not as frequent because of the dams, and when they do occur, they are typically not as severe as they were before the dams were built. But there will still be occasions when significant floods occur downstream of these dams. Planting crops on land that floods on occasion might be profitable in the long run. Building a home or business on that same land might not be. Farming, running a business, or having a home in the flood plain of a river is a risk that each landowner accepts. Six White River Basin lakes are operated together as a system to reduce the frequency and severity of floods. These lakes are Beaver, Table Rock, Bull Shoals, Norfork, Greers Ferry and Clearwater. Beaver, Table Rock and Bull Shoals lakes are in a row along the main stem of the White River in Arkansas and Missouri. Norfork Lake is on the North Fork River, which empties into the White River near the town of Norfork in north central Arkansas. Clearwater Lake is on the Black River near Piedmont, Missouri. The Black River’s confluence with the White River is near Jacksonport, Ark. Greers Ferry Lake is on the Little Red River near Heber Springs, Ark. The Little Red’s confluence with the White River is near Georgetown, Ark. The Corps does not have the legal authority to manage lake levels for recreation. The Corps is bound under the law to follow the White River Water Control Plan, which dictates how the system is operated.
More

Up Next

More Videos

The ARNG will approach H2F as a three phased operation, including defining requirements, experimentation, and implementation. The ARNG H2F implementation strategy is not a universal “one size fits all” approach, States and Territories are afforded the flexibility to experiment through the planning process. FY21 is a planning year for States/Territories to establish those requirements; ARNG requirements will be determined through collaborative, scientific, evidence based research and experimentation. States/Territories conduct market research, small scale pilots, and analysis IOT determine their specific requirements for H2F implementation. Concurrently, ARNG G3 Training Division (TR) will institute a multi-functional working group of industry experts, collegiate human performance centers, and Army professionals to enable collaboration and requirements development. This targeted and individualized approach ensures the collective ARNG requirement possesses relevance, scalability, ease of implementation, effectiveness, and efficiency across the force. The ARNG will report the requirement findings to the Chief of Staff of the Army (CSA) NLT 30 SEP 2021.

 

Application Information

Contact: ngbh2fstaff@army.mil
OIC: LTC William Palmer
NCOIC: MSG David Brooks