Stronger Together Banner

NGB Banner with White Knockout Text & Divider

In crisis? Seeking support is a sign of strength.
24/7 support is available:


988 Suicide & Crisis Lifeline: Call 988 or click here for live chat.

Veterans Crisis Line: Call 988 and press 1; text 838255; or click here for live chat.


NGB Warrior Resilience and Fitness (WRF) Division facilitates the Joint Suicide Prevention Program. The program
enhances suicide prevention-related policies and training, advances data collection and analysis, expands access to
community resources, and conducts strategic communication outreach aimed at reducing suicidal behavior across the
Army and Air National Guard. To learn more about WRF resources, click here.

Time and Distance logo Signs of distress graphic

 

DoD/VA RESOURCES


NATIONAL PROGRAMS


GOVERNANCE

5 minutes logo     ACE logo

NON-CRISIS COUNSELING AND SUPPORT

Video by Capt. Aaron Moshier
Animation: Demolition process of dam near Elizabeth
U.S. Army Corps of Engineers Pittsburgh District
July 2, 2024 | 0:50
The U.S. Army Corps of Engineers Pittsburgh District will demolish the fixed-crest dam at the Monongahela River Locks and Dam 3 near Elizabeth, Pennsylvania, using a series of controlled blasts and excavators on barges.

The U.S. Army Corps of Engineers' contractor will begin the controlled demolition and subsequent removal of the dam beginning July 10, 2024. This date is subject to change based on weather and river conditions.

The controlled demolition will involve explosives, which will restrict navigation activities near the locks and dam facility. Following the initial demolition, the facility will close to waterway traffic for at least three days to allow for the upper and lower pools to level out on the river.

Once the river has leveled, all navigation must lock through the landside chamber until the entire dam is removed and the contractors have cleared the construction area.

It will take approximately six months and several more controlled demolitions, for the contractors to remove the entire dam until December 2024. Once the contractors have removed the dam and cleared the riverway, all waterway users will be able to navigate through the area without using the lock chambers.

The district will begin removing the lock walls in 2025, with the work expected to continue through 2027.

(U.S. Army Corps of Engineers animation by Jake Pope)
More
LTC Elizabeth Cordon

LTC Elizabeth Cordon,
WRF Resiliency Branch Chief

MAJ Giovanni Siaca

MAJ Giovanni Siaca,
Joint Suicide Prevention
Program Manager

CPT Shannon Bush-Smith

CPT Shannon Bush-Smith,
Army National Guard Suicide Prevention Program Coordinator

Capt. Ashley Hollingsworth

Capt. Ashley Hollingsworth,
Air National Guard Suicide Prevention Program Coordinator

 

Contact us logoAir Force Suicide logoMilitary Crisis Line logo