Stronger Together Banner

NGB Banner with White Knockout Text & Divider

In crisis? Seeking support is a sign of strength.
24/7 support is available:


988 Suicide & Crisis Lifeline: Call 988 or click here for live chat.

Veterans Crisis Line: Call 988 and press 1; text 838255; or click here for live chat.


NGB Warrior Resilience and Fitness (WRF) Division facilitates the Joint Suicide Prevention Program. The program
enhances suicide prevention-related policies and training, advances data collection and analysis, expands access to
community resources, and conducts strategic communication outreach aimed at reducing suicidal behavior across the
Army and Air National Guard. To learn more about WRF resources, click here.

Time and Distance logo Signs of distress graphic

 

What is Go SLO?

Go SLO stands for Safes, Locks, or Outside the home.

  • Safes: Store firearms in a gun safe or locked cabinet.
  • Locks: Use trigger locks or cable locks.
  • Outside the home: Temporarily store firearms with a trusted person or at a recommended installation.

Go SLO helps create time and distance between distress and lethal means.

Choose GO SLO: take small steps now to save lives later.

Common Misconceptions


DoD/VA RESOURCES

  • Menu Item


NATIONAL PROGRAMS


GOVERNANCE

NON-CRISIS COUNSELING AND SUPPORT

Video by Mark Rankin
Download
Fast tracking the Everglades Agricultural Area
U.S. Army Corps of Engineers, Jacksonville District
April 13, 2026 | 8:44
Assistant Secretary of the Army for Civil Works Adam Telle announced decisive action to fast-track completion of the Everglades Agricultural Area (EAA) Reservoir Project, with construction now targeted for completion by 2029 and select project actions delegated to the State of Florida. Expedited completion of the EAA Reservoir Project is a prime example of the Building Infrastructure, Not Paperwork initiative in action: to finish nationally significant work with greater effort and emphasis and leverage support from our non-federal partners as a force multiplier for faster delivery. The Everglades Agricultural Area (EAA) Reservoir is one of four phases within the Central Everglades Planning Project (CEPP). Construction of the reservoir is being executed through three U.S. Army Corps of Engineers contracts: Contract 10A, which includes the inflow, outflow, and seepage canals and is now complete; Contract 11A, which covers the reservoir foundation and is scheduled for completion by March 2028; and Contract 11B, which includes the reservoir embankment and water control structures, with a required completion date of December 2029.
More
 
 
Contact us logoAir Force Suicide logoMilitary Crisis Line logo


LTC Elizabeth Cordon

LTC Elizabeth Cordon,
WRF Resiliency Branch Chief

MAJ Giovanni Siaca

MAJ Giovanni Siaca,
Joint Suicide Prevention
Program Manager

CPT Shannon Bush-Smith

CPT Shannon Bush-Smith,
Army National Guard Suicide Prevention Program Coordinator

Capt. Ashley Hollingsworth

Capt. Ashley Hollingsworth,
Air National Guard Suicide Prevention Program Coordinator